"It's just nice to have our own bike path rather than trying to share it with high-speed traffic." A member of a Sun City Summerlin bike club said that to the Las Vegas Review-Journal on April 28, 2026. That morning Clark County officially opened the first mile of the Red Rock Legacy Trail.
At the time, the opening read as a cycling story. It matters more in October. Red Rock Canyon's timed-entry season started October 1 and runs through May 31. The reservation rule covers cars and motorcycles. It does not cover people who arrive on a bike or on foot. For households at The Summit, the Legacy Trail is the first piece of public infrastructure built for that other way into the canyon. The first mile is open. Most of the route still has to be built.
The rule that splits drivers from riders
Under the current Recreation.gov listing for the Scenic Drive, you need a reservation from October 1 to May 31 between 8 a.m. and 5 p.m. A vehicle that gets through the fee station by 8 a.m. can enter without one. Each reservation is a one-hour entry window, limited to one per private vehicle or motorcycle per day. The reservation holder has to be in the vehicle. If you leave the Scenic Drive and want to come back in, you need a new reservation.
Walk-in and bicycle visitors are a separate category. "A timed entry reservation is not required," the listing says. Riders pay the entrance fee or have their pass validated at the entrance kiosk. E-bikes and one-wheels count as bicycles.
So the window that drives all the planning, from 8 to 5, only applies to motor vehicles. Someone on a bike can arrive at 10:30 on a Saturday in November without having booked anything weeks ahead. The listing also warns that parking lots fill early on weekends, holidays and fee-free days, and that visitors arriving between 10 a.m. and 2 p.m. can't count on every lot being open. A bike doesn't need a parking space inside the canyon.
The exemption has been on the books for some time. What was missing was a safe way to ride the first stretch of State Route 159 out of Summerlin. The rider's quote above describes what that used to be like.
What the first mile actually is
Clark County's project page describes Phase 1 as a 0.99-mile, 12-foot-wide paved trail. It starts at the northwest corner of West Charleston Boulevard and Sky Vista Drive and runs west along the north side of SR-159 to the Red Rock Canyon sign. The trail sits inside NDOT right-of-way. According to the Review-Journal, that mile includes a bridge over a wash.
Phase 1 also made changes around the trail itself. FOX5 reported these upgrades:
- a new traffic signal at Charleston and Sky Vista
- a dedicated parking lot for trail users
- the Red Rock Canyon marker moved to a safer spot with its own photo parking
The county's plans also add deceleration lanes at Calico Basin Road, at the drive into the new sign parking lot, and at the road to the Scenic Loop and Red Rock Visitor Center. The sign move means the most photographed spot on this stretch now has a place to pull off instead of a highway shoulder.
Several groups built and backed the trail. Las Vegas Paving was the contractor and Jacobs did the design. The primary funding came from a Federal Lands Access Program grant. At the opening, officials thanked Save Red Rock, the Bureau of Land Management, NDOT, the Federal Highway Administration, and riders from the Southern Nevada Bicycle Coalition.
Where the pavement stops
The open mile ends at the relocated sign. It does not reach the Scenic Drive. The county's original Phase 1 design ran all the way to the Visitor Center and Scenic Loop entrance, but funding shortfalls cut it back to the first 0.99 miles. The rest of Phase 1, the stretch that would bring riders to the fee kiosk, got funding from the Regional Transportation Commission in December 2024. The county says it has no start date yet. Clark County's construction status report, updated September 1, 2026, still lists "Red Rock Legacy Trail - Phase 1" among unassigned projects and gives no new start date.
Here is where each piece stood as of the most recent public information:
| Segment | What it covers | Status, per most recent source |
|---|---|---|
| Phase 1 | 0.99 miles, Charleston and Sky Vista to the relocated Red Rock sign | Opened April 28, 2026 |
| Phase 1 extension | Relocated sign to the Visitor Center and Scenic Loop entrance | RTC funding approved December 2024; no start date |
| Phase 2 | 6.61 miles from the end of Phase 1 to the Scenic Loop exit, with two SR-159 underpasses | Design 70% complete as of August 2025 |
| Full trail | About 19 miles, Summerlin to Blue Diamond Road, in five phases | About $100 million; completion expected within three years, per April 2026 remarks |
Phase 2 is the part that would change how a ride into the canyon feels. According to the county, the path would go under SR-159, curve south and west away from the highway, return north at Moenkopi Road, and cross back under the highway near the Scenic Loop entrance. From there, riders could reach both the Visitor Center and the Scenic Loop. In April, County Commissioner Justin Jones said the full project should be finished within three years, and that its funding is already earmarked through grants and county dollars.
Until the extension is built, the stretch from the sign to the kiosk is the same shared highway riding the bike club described.
Getting to Sky Vista from The Summit
The Review-Journal places The Summit off Town Center Drive, between Tropicana Avenue and Flamingo Road. By car, the trailhead is a direct trip: north on Town Center Drive to West Charleston Boulevard, then west to Sky Vista Drive, where the new lot and signal are. We couldn't confirm a continuous paved bike route from The Summit to Sky Vista. Summerlin's own trail map lists the regional trail links toward Red Rock Canyon as planned connections. For now, most Summit households will drive the bikes to the Sky Vista lot and start the ride there.
A second project closer to home affects the east side of that map. The City of Las Vegas is building a 3.5-mile urban trail along Summerlin Parkway, from Rampart Boulevard to the Summerlin Parkway and CC-215 interchange. It is a 12-foot asphalt path with a pedestrian bridge over a wash and a pedestrian underpass at Crestdale Lane. The city's project listing names at-grade crossings at Anasazi Drive, Town Center Drive and Rampart Boulevard, gives the cost as $26 million, and expects completion in spring 2027. Construction started August 18, 2025. When it opens, it will link the existing CC-215 Beltway Trail with the Bonanza/Angel Park Trail, according to the city's announcement. A crossing at Town Center Drive puts the parkway trail very close to The Summit. It isn't open yet.
Planning a ride in for November
Park hours change on November 1. In October the conservation area is open 6 a.m. to 7 p.m. From November through February it closes at 5 p.m. The Visitor Center is open 8 a.m. to 4:30 p.m. Based on those rules, a reservation-free ride looks like this:
- Park at the new trail lot at Charleston and Sky Vista and cross at the new signal.
- Ride the paved mile west to the relocated Red Rock Canyon sign and its photo pull-off.
- Ride the remaining stretch to the entrance on SR-159, where there is no separate path yet.
- At the entrance kiosk, pay the entrance fee or show a physical annual or lifetime pass to be validated.
- Plan to leave in time for the 5 p.m. closing in winter. The reservation window for cars and motorcycles ends at the same hour.
Cell coverage in the conservation area is limited, according to the Recreation.gov listing, and pass holders have to show the physical pass at the kiosk, so bring the card itself.
Two parts of the Legacy Trail will decide how much this changes over the next few seasons: when the Phase 1 extension starts and when Phase 2 construction begins. The county lists no start date for the extension, and its latest public information on Phase 2 covers design progress only. Updates are posted on Clark County's project page.
At Elevate Real Estate Group, we follow projects like the Legacy Trail and the Summerlin Parkway trail because they change how The Summit connects to the rest of the west valley. If you're thinking about what improvements like these could mean for your home's value, we're happy to prepare a free home valuation built around what's changing on your side of Summerlin.
This article is general information, not legal, tax or financial advice. Consult a qualified professional about your situation.